Lot grading plans and certificates in Whitehorse

From 1 November 2026, the City of Whitehorse requires a Lot Grading Certificate before occupancy on new simple developments. We design the grading alongside your site plan and carry it through to the certificate, so the last step before move-in is not the one that holds it up.

What changes on 1 November 2026

Until now, a Development Officer could ask for a Lot Grading Certificate but did not have to. Under the City's Development Advisory 2026-001, every development permit application received on or after 1 November 2026 carries a condition requiring one before occupancy.

  • It applies to Simple Developments, as the City's Lot Grading Guidelines define them.
  • Country Residential developments are exempt.
  • At minimum, rough grading has to be complete and certified before occupancy. If final grading is finished first, the City accepts one certificate at that stage instead.
  • Complex Developments with engineered civil works are unchanged: the Engineer of Record confirms the grading through the record drawings.

What we do

Grading is engineering, and it is cheapest to get right before anything is built. We prepare the lot grading plan with your site plan, so the development permit and the building permit describe the same lot. Engineering is led by a Professional Engineer (P.Eng.), and the practice holds a Permit to Practice from Engineers Yukon.

Once the work is in the ground, we review the grading at the stage the City needs and prepare the Lot Grading Certificate for submission.

  • Lot grading and drainage design
  • Site plan coordination for the development permit
  • Grading review at rough and final grade
  • Lot Grading Certificate preparation
  • Civil design for grading, drainage and servicing on larger sites

When to call

Before you apply for the development permit. A grading plan drawn after the house is designed tends to fight it; drawn with the site plan, it changes nothing later.

If your permit has already been issued with the new condition, call before rough grading is finished. Checking levels at that point costs far less than regrading a finished lot.

This page summarises City of Whitehorse Development Advisory 2026-001 (4 June 2026). Advisories are not a legal interpretation: the Zoning Bylaw and the City's current Lot Grading Guidelines govern. Read the advisory (PDF)